Sunday, November 17, 2013

Day seventeen

The bathroom is literally down to the studs, the floor, and a ceiling. One of the reps I work with is pretty handing and he came out to the house to help me with the rest of the demo, which means the tub is smashed and in pieces, and the plaster and lathe are down.

I did not order bathroom fixtures today or yesterday because yesterday I thought, oh, maybe we can save the tub and refinish it. But that did not happen after the tub was smashed to bits. I need to measure the door frame though so I can make sure that we'll be able to get the new tub in the bathroom.

No comments: